The Cooperative will offer bulk constructed booths as
described below for participants that apply
for a standard booth.
The construction cost for one booth (9§³) is US$500.
|
|
 |
Having an independent booth means that the participant
has rented only the exposition area. The participant is
responsible for and must bear the expense of the installation
and removal of its booth, and all the work must be done
by companies registered with KINTEX.
For the smooth management and the complete construction
in a short term, the installation parts
should be prefabricated and carried in from outside.
For the construction of any booth, no wall should face
the pathway. If it is inevitable, a wall 1m
away from the pathway and 1m below the ceiling
of the booth may be set up after consultation with
the Cooperative.
The ceilings of all booths should be open. However, small
offices and reception areas may have
a roof.
The height of all installation in the booth is limited
to 4.5m. However, the height of the back wall
can be 5.5m.
All the materials (board, wood, carpet, etc.) for booth
prefabrication should be flame retardant or
incombustible.
All the installation including lighting equipment may
not exceed the allotted booth area.
The participant and the constructing company must submit
an application for the installation of an
independent booth and the construction plan (blueprint,
color model picture, specifications, etc.),
two copies respectively, to the Cooperative
by February 28, 2009. The construction may start only
after the approval of the Cooperative.
All the work in the exposition area must be reported in
a written document by the constructing company, and the
workers must wear admission cards indicating the constructing
company. |
|
 |
Construction date: 08:00 ~ 21:00, March 14, 2009
to March 17, 2009 (four days)
Removal date: 08:00 ~ 21:00, March 23, 2009 (one
day)
¡Ø In case of overtime, the participant must bear any
additional fees according to the exposition area
management provisions. The working
hours can be extended only under the approval of the
Cooperative. The participant must
submit an application for working hours extension to
get
approval.
|
|
 |
All waste generated by booth construction shall be removed
under the responsibility of the
participant.
On the booth construction, a wall may be set up only on
the boundary between two or more
participants. That is, no wall should face the
pathway. But if it is inevitable, a wall can be set up
in a limited area after consultation with the Cooperative.
The booth flooring should be flame retardant and the end
of the carpet should be posted with tape
or latex.
All other booth installation equipment and work must conform
to the INTERMOLD KOREA 2009
detailed management guideline and the KINTEX rental
provisions. |
|
 |
| |
|
|
|
|