The Cooperative will offer bulk constructed booths as described below for participants that apply
  for a standard booth.
The construction cost for one booth (9§³) is US$500.

 

Having an independent booth means that the participant has rented only the exposition area. The participant is responsible for and must bear the expense of the installation and removal of its booth, and all the work must be done by companies registered with KINTEX.

For the smooth management and the complete construction in a short term, the installation parts
  should be prefabricated and carried in from outside.
For the construction of any booth, no wall should face the pathway. If it is inevitable, a wall 1m
  away from the pathway and 1m below the ceiling of the booth may be set up after consultation with
  the Cooperative.
The ceilings of all booths should be open. However, small offices and reception areas may have
  a roof.
The height of all installation in the booth is limited to 4.5m. However, the height of the back wall
  can be 5.5m.
All the materials (board, wood, carpet, etc.) for booth prefabrication should be flame retardant or
  incombustible.
All the installation including lighting equipment may not exceed the allotted booth area.


The participant and the constructing company must submit an application for the installation of an
  independent booth and the construction plan (blueprint, color model picture, specifications, etc.),
   two copies respectively, to the Cooperative by February 28, 2009. The construction may start only
  after the approval of the Cooperative.



All the work in the exposition area must be reported in a written document by the constructing company, and the workers must wear admission cards indicating the constructing company.
Construction date: 08:00 ~ 21:00, March 14, 2009 to March 17, 2009 (four days)
Removal date: 08:00 ~ 21:00, March 23, 2009 (one day)

¡Ø In case of overtime, the participant must bear any additional fees according to the exposition area
    management provisions. The working hours can be extended only under the approval of the
    Cooperative. The participant must submit an application for working hours extension to get
    approval.

All waste generated by booth construction shall be removed under the responsibility of the
  participant.
On the booth construction, a wall may be set up only on the boundary between two or more
  participants. That is, no wall should face the pathway. But if it is inevitable, a wall can be set up
  in a limited area after consultation with the Cooperative.
The booth flooring should be flame retardant and the end of the carpet should be posted with tape
  or latex.
All other booth installation equipment and work must conform to the INTERMOLD KOREA 2009
  detailed management guideline and the KINTEX rental provisions.